Winnipeg, MB · roof reports + roofing software

Roof Measurement Reports & Roofing Software for Winnipeg Contractors

Measure Winnipeg roofs from the office through a short building season, build each estimate from the take-off, and run the lead, proposal, job and invoice in one roofing platform.

Roof Manager supports roofing contractors in Winnipeg and the Winnipeg region. Report availability for an individual property depends on usable aerial or satellite imagery for that property.

Roof reports for Winnipeg and nearby markets

Transcona, St. Vital, St. James and Charleswood are all inside the City of Winnipeg, so the City rules below apply there. East St. Paul, West St. Paul, Headingley, Oakbank (in Springfield), Selkirk and Stonewall are separate municipalities that issue their own permits. None of them has a Roof Manager city page: order for them from your account.

  • WinnipegThis page
  • East St. PaulOrder from your account
  • West St. PaulOrder from your account
  • HeadingleyOrder from your account
  • OakbankOrder from your account
  • SelkirkOrder from your account
  • StonewallOrder from your account

Roof Manager supports roofing contractors in Winnipeg and the Winnipeg region. Report availability for an individual property depends on usable aerial or satellite imagery for that property.

Winnipeg permits, streets and noise: the City rules for roofers

The City of Winnipeg is its own permit authority under the Winnipeg Building By-law, and Public Works controls the street in front of the house. These are the rules a roofing crew meets on an ordinary Winnipeg job, from winnipeg.ca and the City’s by-laws.

Re-shingling with the same material

The City lists replacing shingles with the same material among projects that need no building permit, and the Winnipeg Building By-law exempts replacing roofing material with the same material. The work must still follow the building code and zoning, and the City tells homeowners to make sure a hired contractor gets any permit before work begins.

Source: City of Winnipeg: Home improvement projects · Winnipeg Building By-law 4555/87 (PDF)

Structural roof work and solar

The City’s alteration permit application asks for structural drawings when roof structural members such as rafters or trusses are altered, repaired or replaced, and for dormers, finishing an unfinished attic and installing skylights; engineering may be required. A building permit is required for every roof-mounted solar PV installation.

Source: City of Winnipeg: Alterations permit application (PDF) · City of Winnipeg: Solar PV bulletin (PDF)

Bins and materials on the street

Equipment, materials or waste kept on a Winnipeg street needs a Public Works use of street permit. A curb lane usage permit covers up to three days on a section of street where parking is permitted; a construction permit closes and occupies a set area of the street for a defined period. Permit holders need a $2,000,000 general liability policy.

Source: City of Winnipeg Public Works: Permits

Noise hours and downspouts

Loud construction work within 150 m of a home is allowed from 7 a.m. to 9 p.m. Monday to Friday, and from 9 a.m. to 9 p.m. on weekends and holidays (Neighbourhood Liveability By-law). Downspouts need an elbow and an extension or splash pad to carry water away from the foundation, and directing surface water onto neighbouring properties, back lanes, sidewalks or streets is against the City’s Lot Grading By-law.

Source: City of Winnipeg: Construction in your neighbourhood · Neighbourhood Liveability By-law 1/2008 (PDF) · City of Winnipeg: Downspouts

General information for contractors, checked October 13, 2026; it is not legal advice. Confirm with the City before you rely on it. Roof Manager does not obtain permits or licences for you. Province-wide rules: roofing in Manitoba.

A reviewed roof report for the Winnipeg property

  • Roof area by plane, pitch, and eave, rake, ridge, hip and valley lengths
  • A labelled diagram over the traced aerial image
  • A waste table and the material take-off

For a Winnipeg contractor, the take-off prices the estimate against your own price sheet, and the signed proposal turns into a scheduled job and then the invoice. What a report includes · the roofing CRM.

  1. LeadOn the leads board
  2. Roof reportOrdered from the address
  3. Estimate & proposalPriced from the take-off, signed online
  4. JobScheduled to Google Calendar
  5. InvoicePaid through Square Pay Now

Metric or imperial

Switch any report to square metres and metres in the viewer; the PDFs follow. Reports open in imperial, and squares, bundles and the CSV, Excel, JSON and XML exports stay imperial.

Roof area
736.1 m²7,923 sq ft
Eaves
116.7 m383 ft
Hips
113.1 m371 ft

From the Roof Manager sample report.

What a Winnipeg roof report costs

2 free reports with no credit card, then $10 CAD a report, or $199 CAD a month for up to 30 reports; the same price everywhere in Canada. The CRM, proposals and invoicing are free with every account. All plans · the sample report.

Winnipeg roof report questions

Does Roof Manager work in Winnipeg?

Yes. Roof Manager supports roofing contractors in Winnipeg and the Winnipeg region. Report availability for an individual property depends on usable aerial or satellite imagery for that property.

Does re-shingling need a permit in Winnipeg?

Not when the shingles are replaced with the same material: the City lists it among projects that need no building permit. The work still has to follow the building code and zoning, and structural roof work needs a permit with structural drawings.

Do roofers need a City of Winnipeg business licence?

No. The City licenses 11 business activities and roofing is not one of them; its contractor licensing covers electrical, plumbing, mechanical and demolition trades.

When can a Winnipeg roofing crew start making noise?

Loud construction work within 150 m of a home is allowed from 7 a.m. to 9 p.m. on weekdays and from 9 a.m. to 9 p.m. on weekends and holidays.

Can I order reports for East St. Paul, Headingley or Selkirk?

Yes. Order them from your account like any Winnipeg address; each property still needs usable imagery. Those municipalities issue their own permits, so the City of Winnipeg rules on this page do not apply there.

Do Winnipeg roof reports use metric units?

Any report can be switched to square metres and metres in the viewer, PDFs included. Reports open in imperial; roofing squares and bundles stay as ordering units.

How accurate are the measurements?

On properties with high-quality imagery, Roof Manager measurements can achieve 98.5% accuracy against an on-roof tape measure. Accuracy depends on the quality and visibility of the available imagery.

What if the imagery is not clear enough?

Our team declines the report instead of guessing, and the credit returns to your account.

How much does a report cost?

2 free reports, then $10 CAD each or $199 CAD a month for up to 30.

Measure your next Winnipeg roof

Open a free account, enter the address and look at the imagery for that roof before you spend a credit.

Order a report

Search the address, pin the roof, see the imagery, order.

Get 2 Free Reports

See the finished report first

The complete 5-page Roof Manager sample report.

See a Sample Report

Roof Manager in Manitoba · across Canada · sales@roofmanager.ca